Plan, forecast, and visualize scenarios on live data sources without duplicating datasets, rebuilding models, or relying on technical teams. By unifying planning, budgeting, and forecasting data with visualizations, you can:
In this article, you learn how to integrate planning data in intelligence sheets and visualize plans, budgets, and forecasts in real-time.
Visualizing simulations, budgets, and forecasts allows finance teams and operational stakeholders to move beyond static, historical reporting. By embedding live planning sheets directly into intelligence sheets, you build an interactive analysis environment where drivers can be manipulated on the fly and immediately reflected across your reports and dashboards.
Live data binding vs. static snapshots:
Unlike traditional BI dashboards that require batch refreshes or data pipeline execution, intelligence sheets establish direct data bindings to embedded planning sheets. Any input change, scenario simulation, or formula update instantly flows through to charts and KPI cards.


This action embeds the selected planning sheet into the intelligence sheet.

Blend data from multiple sources by combining dimensions and measures from external files, semantic models, planning sheets, and PowerTable sheets into a single analysis.
After you embed a planning sheet, measures from the sheet, such as input values, formulas, simulations, and forecasts, appear under From Sheets in the Data pane.
In this example, the Budget Simulation measure is combined with dimensions and measures from a source file to create a breakdown waterfall chart and a pie chart.


Reduce the Infrastructure budget from 7M to 2M and observe how the pie chart proportions change.

The Planning visual embeds an existing Planning Sheet onto the Intelligence canvas, so at least one Planning Sheet needs to already exist in the Plan app for it to reference.
The sheet picker ("Select an Existing Planning Sheet") lists every Planning Sheet available, and you choose the correct one. If multiple Planning Sheets exist, you should choose the correct one.
It's live and editable. Adjusting any cell value in the embedded Planning Sheet updates charts, KPI cards, table, and matrix visuals in an Intelligence sheet.
Comparison 1 and Comparison 2 pull directly from the semantic model's stored base measures (Plan, Actuals). From Sheets instead pulls a live field from the embedded Planning Sheet itself — Plan (Simulation) — which reflects whatever scenario values are currently entered on that sheet, including edits made after the KPI card was built.