You can build your first plan in Microsoft Fabric on what you already have. If your actuals already live in a Power BI semantic model on Fabric capacity, you can plan on them. No new platform to buy, no cube to build first, nothing to install, and no connection to set up.

The Three Things a First Plan Needs

  • Fabric capacity (usually in place). An F SKU or Power BI Premium (P1 and up). Often the capacity you already run reports on.
  • Semantic model (usually in place). The model your reports already trust, governed by your data team. The plan reads it directly.
  • Plan item (ready in one click). Created in the workspace and connected to your model in a single click. No connection to set up, and the admin settings it relies on are on by default.

In this article:

What You Need, and What to Watch For

Check each item once before you build. Most teams find everything is already in place.

You needWhat countsWatch for
CapacityMicrosoft Fabric F SKUs, or Power BI Premium P1 and upPower BI Pro and Premium Per User aren’t supported. The smallest SKUs can hit XMLA and memory limits, so size for your model.
Semantic modelA model in a shared workspace, on that capacityModels in My workspace aren’t supported. Direct Lake and DirectQuery models connect over single sign-on, with no extra configuration.
PermissionsThe same access you need to build a Power BI report on the model. Workspace Admin or Member rights aren’t required.Row-level and object-level security on the model still apply to each signed-in user.
A business ownerOne process and one person who owns its numbersStart with the cycle that costs your team the most time, not the whole enterprise.
First-plan requirements

Build Your First Plan in Microsoft Fabric in Five Steps

No cube, no backend model, no connection to set up and no consultant build before the first plan. Business users can do every step, and the admin settings it needs are on by default.

Step 1: Pick One Process to Plan

Choose the planning process that costs your team the most time today, such as a monthly forecast still run on emailed spreadsheets. One plan, one owner, one semantic model your team already reports on.

Step 2: Create a Plan Item

In your Fabric workspace, select New item › Plan, give it a name and select Create.

With the Native Planning Engine turned on, planning inputs are stored in OneLake and no Fabric SQL system database is needed. Learn more in the Native Planning Engine blog. Watch this step in Skills Hub S1E1: Create a Plan Work Item.

Step 3: Connect Your Semantic Model

Under Get data, select the semantic model your reports already use, and connect. You connect with your own signed-in identity, using the same permissions you use to build a Power BI report. Actuals come straight from the model, so nobody pastes them in again.

Connect a Semantic Model to Fabric Plan in a Few Clicks

Demo, about 1½ minutes: create a plan from your workspace, select a semantic model under Get data, and start planning with your existing workspace permissions. Also on the Fabric Plan community.

Choose the model carefully. Each Plan item connects to one semantic model, and the connection can’t be changed later. To plan on different data, create another Plan item.

Step 4: Build the Sheet

Drag dimensions and measures from the model onto a Planning sheet, then add plan fields for the numbers people will enter: budget, forecast or target. Add scenarios and versions as you need them.

See it step by step in Planning 101 – Getting Started with Planning Sheets (video) and Create a planning sheet (docs).

Step 5: Invite Contributors and Run a Cycle

People join through the workspace and the apps they already use. They enter numbers, run what-if simulations, comment and submit for approval, and every change keeps an audit trail.

When the plan is approved, write it back so reports and other Fabric experiences can use it. Set up writeback to OneLake.

A Realistic Timeline

Because the capacity, the model and the security are already in place, and there’s no connection to set up, the time goes into the plan itself rather than the platform.

WhenWhoWhat happens
Day 1BuilderPlan item created and semantic model connected in a few clicks. The Fabric admin steps in only if a tenant setting was turned off
Week 1Business owner and builderFirst Planning sheet on real actuals, plan fields added, reviewed with the owner
Weeks 2–3Builder with a few contributorsScenarios, approvals and writeback set up; a dry-run cycle with real users
Week 4 onwardAll contributorsThe first live cycle runs in Fabric Plan instead of spreadsheets
From first click to a live planning cycle

Avoid These First-Plan Pitfalls

  • Don’t rename the model or workspace. Renaming a connected semantic model, or the workspace that holds the Plan item, breaks the plan.
  • Check private link settings. Workspaces that use private links don’t support Plan items. Tenant-level private links are supported.
  • Plan at the grain decisions need. If a team plans by region and month, don’t load every product and day. Extra detail slows the sheet without adding value. See Key Considerations for Planning at Scale.
  • Start with one plan, not ten. Prove one cycle with one owner, then extend to other teams. Each team can plan its own way on the same model, and Home Layout gives each role its own landing page.

Three Ways to Start This Week

Start with one plan. Pick the process that costs you the most time and build it on a semantic model your teams already trust. With self-service onboarding, you can connect it today.

Work with a partner. A Fabric Plan partner can design the first plan with your data team and take it live.

Explore on your own. Watch Connect a Semantic Model to Fabric Plan in a Few Clicks and What’s New in Fabric Plan: Five Pillars for Planning, work through the Fabric Planning tutorials, and read the documentation on Microsoft Learn and the Fabric Plan documentation. More demos and training are on community.fabricplan.com.

Admin Settings: On by Default

For your Fabric admin, only if a setting was turned off.

There’s no connection for an admin to set up, and the tenant settings Fabric Plan relies on are on by default. Your Fabric admin only needs to act if one of these was turned off in your tenant. They’re in the Admin portal:

  • Tenant settings › Integration settings › Allow XMLA endpoints and Analyze in Excel with on-premises semantic models is on.
  • Tenant settings › Developer settings › Embed content in apps is on.
  • Capacity settings › XMLA Endpoint is set to Read Only or Read Write on the capacity that hosts the semantic model.
  • Recommended: Store new Plan items in OneLake is on at the tenant and workspace levels, so new plans use the Native Planning Engine. See how.
  • Only if you automate with a service principal: Service principals can call Fabric public APIs is on.

Set up Fabric Plan before October 31, 2026? Onboarding then needed a DMTS connection and Workspace Admin or Member rights. See what changed in What’s New in Fabric Planning: FabCon Europe 2026 Updates.

Sources

Settings and limits reflect Microsoft Learn and Fabric Plan documentation at the time of writing; check the linked pages for the latest.

Share on:

Comments

0

Leave a Reply

More from the blog

Microsoft, Azure, Copilot, Excel, Fabric IQ, Microsoft Entra, Microsoft Fabric, Microsoft Teams, OneLake, Outlook, Power Automate, Power BI and SharePoint are trademarks of the Microsoft group of companies. IBCS is a registered trademark of IBCS Association. All other trademarks are the property of their respective owners.

This community is operated independently by Lumel. Nothing on this site constitutes a representation or warranty by Microsoft.
arrow-left