PowerTable turns your Fabric data into a no-code app. Teams can edit, track, approve and govern their data, right where it lives. From master and reference data to products, projects, tasks, timesheets and budgets, every team gets one secure place to work. No exporting to spreadsheets, and no waiting on IT. New to PowerTable? Start with What are PowerTable sheets in planning? on Microsoft Learn.
The PowerTable November 2026 release brings exciting enhancements across data management, analytics, project management, and automation. We’ve strengthened Security & Governance, enhanced Microsoft Teams integration across approvals and automations for more proactive tracking, and introduced JSON data type support to expand unstructured data capabilities. Crosstab gets richer pivot functionality, while Kanban brings improvements for easier data updates and tracking. We’re also introducing Earned Value Management metrics in Gantt to help monitor project and task health.
1. Security & Governance
PowerTable security now lets you control who sees and changes each column, and who manages the security settings themselves.
1.1 Column Access
Column Access, in Security, sets Read, Insert and Update permissions for each column of a table, per role. Read shows or hides the column. Insert controls whether a user can enter a value in a new row. Update controls whether a user can change a value in an existing row. Settings apply to all roles or to specific roles. When a user has several roles, an access is granted if any of those roles grant it.

Use case: An HR team shares one employee table with the whole business. Managers can see salaries for their reports but can’t change them, while HR administrators keep them up to date. For everyone else, the salary column simply isn’t there, so one table serves every team with no oversharing.
For a full walkthrough, see Column Access: Column-Level Security for PowerTable.
1.2 Control Which Contributors Manage Security Settings
The new Security access page sets whether Workspace Contributors can edit security and governance settings. Choose Yes for all Contributors, No for none, or Specific Contributors only for the Contributors you add to a list. The item owner, Workspace Admins and Workspace Members always have full edit access. The setting covers roles, user attributes, policies, approvals, row and column access, and creating and deleting sheets. It does not affect editing table or planning data. The same page also links to OneLake security, where you control who can access writeback data in OneLake.

Use case: A finance team works in a shared budgeting workspace where every member is a Contributor. Everyone can update budget data, but only the two team leads are on the list of Contributors who can change approval rules and column access. The team moves fast, and the controls stay in trusted hands.
How to Set Up Security & Governance
Where to find it: Open Security at the top right of the sheet. Column Access: Security › Column Access. Security access: Security › General › Security access.

Column Access
- Open Security and select Column Access.
- Select the table you want to secure.
- Choose All Roles, or Specific Roles and add the roles to configure.
- Turn Read, Insert and Update on or off for each column.
- Select Save Changes.
Security access
- In Security, open Security access under General.
- Choose Yes, No or Specific Contributors only.
- If you chose specific Contributors, add them to the list.
2. Teams Channel Notifications
Automations and approvals can now post messages to Microsoft Teams channels.
2.1 Automations
Send a message in a channel is now available as an action in PowerTable automations. It works with Update, Insert, Delete, Insert using Forms and Button triggers. Write the message, then connect to Microsoft Teams and choose the team and channel to post to. Messages can include dynamic content. Insert fields from the record that triggered the automation, such as a task’s name or start date. Or add predefined values, such as the current date and time. Messages are sent with the permissions of the user who triggers the automation.

Use case: A high-priority task is created, and the delivery team’s channel hears about it in seconds: “New high-priority task Payment Gateway Integration starts on November 25, 2026.” No one has to refresh a grid or forward an update to keep everyone in the loop.
2.2 Approvals
Approvals can now notify Teams channels in addition to the approvers. In Approvals Configuration, under Notifications, add one or more Teams channels. Each channel is listed with its team and the person who added it, and can be removed at any time.
Use case: A regional manager submits a budget change late in the quarter. The request shows up right away in the finance approvers’ Teams channel, where they’re already working together. Approvals keep moving without anyone digging through an inbox.

How to Set Up Teams Notifications
Where to find it: Automations: Setup › Automations. Approvals: PowerTable › Approvals.
Automations

- Open the automation and set its trigger: Update, Insert, Delete, Insert using Forms or Button.
- Select Add Action and choose Send a message in a channel as the Action Type.
- Write the message. Select + to insert fields from the record or predefined values.
- Under Configure Channels, select Add Channel, connect to Microsoft Teams, and choose the team and channel.
- Save the automation.
Approvals

- Open Approvals Configuration.
- Under Notifications, select Add Channel and choose the team and channel.
- Select Save.
3. JSON Data Type
The JSON data type lets you store key-value pairs, nested objects and arrays in a single column, and edit them like any other field.
Use cases: Not all business data fits neatly into fixed columns. Now it doesn’t have to. JSON opens PowerTable to semi-structured data in every industry:
- Flexible attributes: A laptop has RAM and battery life. A T-shirt has size and fabric. Every product keeps exactly the details it needs in one column, with no sea of empty cells.
- Nested details: Dimensions, materials and machine settings stay with the product they describe. The full picture in one row, with no extra tables to build or maintain.
- Lists of values: Skills, certifications and languages travel with each employee, however many there are. Resource managers see every qualification in one place when staffing a project, with no separate skills table.


How it works:
- Two input types: Keys Only for free-form key and value pairs that vary from record to record, or Strict for a defined structure.
- Typed fields: Strict columns give each field its own type, such as Number, Text, Date, Boolean, Select, Array or Object. Fields can have friendly display names and can be marked as mandatory.
- Built for everyday editing: Add a JSON column when you upload data, connect an existing table or create a new column. In the grid, values display as readable fields instead of raw text. Selecting a cell opens an editor with the right control for each field, such as a dropdown, date picker or toggle. Nested objects sit in expandable sections, and values that don’t match a Strict column’s structure are flagged for review.
How to Set Up a JSON Column
Where to find it: For a new column, PowerTable › Insert Column › Database Column. For an existing table, Setup › Columns.
- Upload a file, connect an existing table, or add a new column.
- Set the column’s data type to JSON.
- Choose the input type: Keys Only or Strict.
- For a Strict column, add each field with its name, input type and display name, and mark the mandatory ones.
- Save the table configuration.
4. Crosstab: A Complete Planning Canvas
Crosstab displays table data as a pivot. Dimensions sit in Rows and Columns, and the values in the cells are editable. Every change is written back to the source table.
Crosstab now lets you generate the grid you need, enter data at any level of detail, and decide how every value is summarized.
4.1 Generate the Planning Matrix Automatically
Generation Strategy sets which rows and columns Crosstab creates:
- None: Shows only the combinations that already exist in the data.
- All Combinations: Generates every combination of the assigned dimensions from their lookup tables, even where no data exists yet.
- Valid Combinations: Generates only the combinations defined in one or more mapping tables, and shows all others as read-only.
Use case: Picture a sales team planning by product, region and salesperson. Pair a product-region map with a region-salesperson map, and the planning grid builds itself. Every valid combination is ready to fill, and nothing that doesn’t belong gets in the way.


4.2 Multiple Column Dimensions
The Columns field accepts multiple dimensions, such as Region, Salesperson and Month. Their order sets the header hierarchy. Date, single-select and lookup fields can be combined.
Use case: A sales director reviews targets across the whole organization. With Region, Salesperson and Month stacked in Columns, every salesperson in every region appears side by side, month by month, in one view. No more stitching reports together to see how the team is tracking.

4.3 Dates in Rows
Date fields can now be added to Rows. They use the same Time Interval, Date Range and Date Hierarchy settings as in Columns. Crosstab generates a row for each period in the range, and can add Year and Quarter columns from the hierarchy.
Use case: A product planner builds a monthly forecast with months down the side and regions across the top. The year and quarter stay in view next to every month, so seasonal patterns are easy to spot. Forecasting feels as easy as a spreadsheet, with every number saved straight to the source.

4.4 Row-Only Layouts
A Crosstab can be configured with only Rows and Values, without a Column dimension. Generation, aggregation and subtotals work the same way.

Use case: A finance team collects budget lines by department and cost center. A row-only Crosstab gives them a clean list to fill in, with subtotals for each department rolling up on their own. No extra columns and no manual totals.
4.5 Drilldown
With Drilldown on, selecting a cell opens a detail view of the values behind it. Drill by field, such as Task under Project. Or drill by time, such as Week or Day under Month. Values entered in the detail view are written to the matching record and date. With Drilldown off, a Period Reference Date sets which date each summary value is read from and written to. Choose First Day, Last Day or a specific day.
Use case: A project manager reviews logged hours by project and month. When a month looks light, they open the cell and enter hours week by week, task by task. The big picture and the fine detail stay one click apart, and every value lands on the right record and date.

4.6 Value Aggregation
Each field in Values has its own aggregation, set from its ellipsis menu. Number fields support Sum, Average, Minimum, Maximum, Count and Count Distinct. Text and date fields support First, Last, Count and Count Distinct. Binary fields support Count and Count Distinct. The aggregation applies to subtotals, grand totals, drilldowns and collapsed column groups.
Use case: A delivery lead tracks hours and status for every task in one Crosstab. Hours are summed for each period, while Status shows the latest value, so effort and progress sit side by side. Every number tells the story it should.

How to Set Up Crosstab
Where to find it: PowerTable › Layout › Crosstab. To change an existing Crosstab, PowerTable › Layout › Manage Layout.

- Open the Crosstab layout configuration.
- Assign dimensions to Rows and Columns. Add several dimensions to Columns, add a date field to Rows, or leave Columns empty for a row-only layout.
- Add fields to Values, and choose each field’s aggregation from its ellipsis menu.
- Under Generation Strategy, choose None, All Combinations or Valid Combinations. For Valid Combinations, select one or more validity tables, then set the interval and generation range.
- Turn on Drilldown and choose a drilldown field or time interval. Or leave it off and set a Period Reference Date.
- Save the layout.
5. Kanban: Keep Work Flowing
Kanban groups table rows into stacks by a status column. Moving a card to another stack updates its status.
Kanban now lets you set a limit on each stage and add new stages without leaving the board.
5.1 Stack Limits
Stack Limit, in each stack’s menu, sets the maximum number of cards a stack can hold. It works for any stack, whether the board is grouped by stage, owner, priority or any other column. The header shows the current count against the limit. A red Max marker appears when the count goes over it. Each stack can have its own limit, or none.
Use case: A development team caps its Review stack at six cards. When a seventh card lands, the Max marker appears on the header, and the team knows it’s time to finish reviews before starting anything new. Bottlenecks show up before they become problems.

5.2 Add a Stage from the Board
The + Add Stack button sits after the last stack. The name is added as a new value of the status column. Cards moved into the stack take that value when saved.
Use case: Work on an integration stalls while the team waits on a vendor. The team lead adds a Blocked stage straight from the board and moves the affected cards into it. Everyone can see what’s stuck, and the board stays an honest picture of the work.

How to Set Up Kanban Limits and Stages
Where to find it: PowerTable › Layout › Kanban.

Stack limits
- Open a stack’s menu and select Stack Limit.
- Enter the maximum number of cards for that stack.
New stages
- Select + Add Stack after the last stack.
- Type a name and press Enter.
- Move cards into the new stack and select Save to Database.
6. Earned Value Management
Earned Value Management lets you see whether a project is on schedule and on budget, in the same plan your team works in.
Earned Value Management (EVM) is the standard project control method for tracking schedule and cost together. It complements your Gantt schedule by showing whether spending is in line with progress. EVM compares three figures against an approved baseline. These are the budgeted value of work planned to date, the budgeted value of work completed, and the actual cost so far.

PowerTable now calculates EVM on your project plans. Inputs from your task, resource and time-entry tables are mapped once in Layout Configuration. PowerTable then calculates Budget at Completion, which is locked when you save a baseline. It also calculates Planned Value, Earned Value, Actual Cost, Schedule Variance, Cost Variance, Schedule Performance Index (SPI) and Cost Performance Index (CPI). Variances show how far ahead or behind a project is in money terms. An SPI or CPI below 1.0 means the project is behind schedule or over budget.
Use case: Take a $100K project with an SPI of 0.88 and a CPI of 0.78. An SPI of 0.88 means the team has completed 12% less work than scheduled so far. A CPI of 0.78 means every dollar spent is earning 78 cents of budgeted work. Your PMO knows while there’s still time to act.
How to Set Up Earned Value Management
Where to find it: On a Gantt layout, PowerTable › Insert Column › Visual Column › Add Derived Column.

- In the Gantt layout configuration, map your task, resource and time-entry columns, such as dates, effort, progress, rates and costs.
- Save a baseline to lock in Budget at Completion.
- Select Add Derived Column, expand Earned Value Management, and select the metrics to show.
- Select Apply.
Try the PowerTable November 2026 Updates Today
This release helps teams spend less time wrangling data and more time acting on it. Because it all runs on your Fabric data, everything stays in one governed place.
Start with the update closest to a challenge your team has today: a sensitive column, a product table full of empty cells, or a board that’s always overloaded. Turn it on, and see what changes.
Secure data, flexible structure and plans that build themselves, all in the place your teams already work.
Feature details reflect Fabric Plan at the time of writing.

Comments
0Please log in to comment.